1、 Completion acceptance

personnel arrangement for completion acceptance: 1. Carpentry; 2. Water electrician; 3. Mason; 4. Painter; 5. Small worker; 6. Supervision; 7. Quantity reviewer

owner's work procedure:

1. Check lamps, sockets, telephones, televisions, computers, sound cables

2. Check water pipes, faucets, sanitary ware, and confirm the quantities

3. Check floor tiles, wall tiles, and confirm the quantities

4. Check the ceiling gypsum board, metal gusset plate, and confirm the quantities

5. Check the wood modeling, doors and windows, cabinets, doors and other parts of the paint, and confirm the quantities

6. Check the wall coating and wallpaper, Confirmation of quantities

working time: generally about 1 day, which will vary according to the size of the house and the difficulty of construction

diy Management Guide: 1. All types of construction personnel are in place. 2. Check all parts. 3. Timely acceptance and signature: sign in time after all items are qualified. Don't delay or worry

acceptance stage: 1. All parts are qualified 2. Confirmation of quantities, confirmation of increase and decrease items

investment suggestions: both parties should handle the written documents of handover and acceptance, which should be signed by both parties

2. Occupancy stage

A) cleaning: yourself or cleaning company. Working procedures:

1, cleaning lamps, sockets, telephones, televisions, computers, sound lines

2, cleaning water pipes, faucets, sanitary ware

3, cleaning floor tiles, wall tiles

4, cleaning ceiling gypsum boards, metal gusset plates

5, cleaning wood shapes, doors and windows, cabinets, doors and other parts of paint, glass, stairs

6, cleaning wall coatings, wallpaper

7, cleaning electrical appliances

8, cleaning doors and outdoor Outdoor balcony

working time: generally about 2 days, which will vary according to the size of the house. Curtain and furniture shall be carried out again after mobilization

diy management guide

1. Preparation tools: glass cleaner, foam cleaner, mop, rag

2. Paint, sanitary ware, floor surface treatment should be gentle

acceptance stage: 1. All parts are qualified; 2. Confirmation of quantities, confirmation of increase and decrease items

b) curtain purchase: after cleaning. Guide for choosing curtains

1. Style: decide according to the designer's suggestions or the soft decoration designer's suggestions

2. Material: it can fully reflect the family's taste, and it is recommended not to choose too poor materials

3. Production: the quality of factory production is better

4. Installation: pay attention to the firm installation to avoid damaging the wall